All type of chassis checked & Arrival report prepared before induction.
Truck & Bus chassis cleaning by car washer.
Mud & Foreign particles removed with pressurized water before induction the chassis.
Separate location & fixtures for Cab doors preparation & fixing.
Robust testing rig complying to IS 11865 to test all Buses & Cabs.
Line production being followed for a continual order to speed up the productivity, Uniform Build & Consistent in Quality.